成全视频在线观看,久久不见久久见免费影院国语 ,天堂资源中文,拔萝卜痛又叫黄

How to realize good explosion-proof performance of liquid ammonia emergency shut-off valve?

Time:2021-09-17
Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.

How to adjust the pressure relief valve group of the concrete pump truck correctly? In the construction process, if the operators move disorderly due to their unclear understanding of the performance of each part of the concrete pump truck, it will easily lead to various faults in the operation of the concrete pump truck, which will bring a lot of inconvenience to the on-site construction. Generally, the regulation of pressure relief valve group, as an essential step in the operation process, also plays an important role in the whole construction process.


1、Overflow valve regulation

When adjusting the pressure relief valve group, first adjust the condition of the overflow valve through the following steps: first loosen the adjusting rod of the superimposed overflow valve under the electromagnetic directional valve on the main valve block, and then tighten all the adjusting rods of the unloading overflow valve on the pressure relief valve group. Remove the electromagnet plug on the main overflow valve, press the positive pump button, then slowly adjust the superimposed overflow valve, observe the reversing pressure gauge, and lock the adjusting rod if the pressure is.


2、Accumulator unloading ball valve regulation

After adjusting the overflow valve, the adjustment of the accumulator unloading ball valve is also very important. The operation steps are as follows: open the accumulator unloading ball valve, loosen all the adjusting rods of the unloading overflow valve, then close the accumulator unloading ball valve, slowly tighten the adjusting rod of the unloading overflow valve, and then observe the condition of the reversing pressure gauge. When the pressure indication is 16MPa, the adjustment can be stopped, Lock the adjustment lever.


3、Regulation rules

In the whole regulation process, because the gear pump is connected with the accumulator, the pressure changes slowly during regulation, and attention should be paid not to be too fast during regulation. After adjustment, plug in the electromagnet plug on the main overflow valve to stop pumping.

主站蜘蛛池模板: 汤阴县| 孝义市| 阳城县| 乌兰浩特市| 陆河县| 农安县| 德钦县| 舞钢市| 罗城| 林甸县| 丰宁| 于都县| 大竹县| 瑞丽市| 河曲县| 绥芬河市| 滕州市| 屏山县| 永泰县| 永兴县| 双桥区| 绿春县| 卓尼县| 比如县| 贵南县| 毕节市| 达州市| 福州市| 北辰区| 晋州市| 城口县| 沅江市| 闻喜县| 江华| 亚东县| 栖霞市| 吉林市| 习水县| 新兴县| 洪泽县| 哈巴河县|